Irrigation Rates

Rate 2
Load Management - Poultry - Schedule LM-P

Facilities Charge

$25.00

per month

Demand Charge

$4.50

per KW

Energy: First 300 HUD

7.29

cents/kwh

Additional KWH

4.59

cents/kwh

On Peak Demand

$6.00

per KW

On Peak Energy

75

cents/kwh

 

This is a special rate for poultry growers who want the most economical rate available. The customer is required to run their backup generator at certain peak days from 2:00 – 7:00 pm. These peak days vary but generally are around ten days per year.

 

Rate 4
Seasonal Service - Schedule SS

Facilities Charge

$17.00

per month

Energy

First 1000

19

cents/kwh

Next 9000

15

cents/kwh

Additional

12

cents/kwh

 

This rate can be used on small pumps, pivots, or other loads that do not require a transformer KVA over 50 KVA.

 

Rate 6
Agricultural Time-of-Use

Facilities Charge

$25.00

per month

On Peak Energy

75

cents/kwh

Off Peak (First 10K kwh)

9.2

cents/kwh

Additional kwh

7.9

cents/kwh

 

This is generally used on irrigation pumps, but can be used on any agriculture load that can be shut off during summer peak hours. The customer is responsible for shutting off the load. The peak hours are defined as 2:00 – 7:00 pm, Mon. – Fri. except July 4th and Labor Day beginning June 1st through September 30th.

 

Rate 7
Seasonal Service/Demand - Schedule SS-D

Facilities Charge

$25.00

per month

Demand Charge

$6.00

per KW

Energy (First 100 HUD)

19.2

cents/kwh

Additional KWH

13.2

cents/kwh

 

This is for large seasonal loads that require over 50 KVA Transformer. This is a non interruptible rate.

 

Rate 9
Load Management - Irrigation - Schedule LM-I

Facilities Charge

$25.00

per month

Energy Charge:

First 3000 KWH

15.5

cents/kwh

Next 7000 KWH

11.7

cents/kwh

Additional

7.9

cents/kwh

 

This rate is for irrigation pumps that can be shutdown during certain peak days. MGEMC will install a switch that will be activated during the peak hours of 2:00 – 7:00 pm, Mon – Friday on certain peak days. These peak days vary but generally are around ten days per year. The customer is responsible for restarting the load after 7:00 pm. The load being controlled must have a contactor or similar starting device that can be controlled with switch or else they will not qualify for this rate. The switch must remain energized and can not be shutdown by another disconnect.

 

Rate 14
Cotton Gins - Schedule CGS

Facilities Charge

$300.00

per month

Energy Charge

9.6

cents/kwh

 

This is only for Cotton Gins